Please wait a minute...
Submit  |   Chinese  | 
 
Advanced Search
   Home  |  Online Now  |  Current Issue  |  Focus  |  Archive  |  For Authors  |  Journal Information   Open Access  
Submit  |   Chinese  | 
Engineering    2017, Vol. 3 Issue (1) : 150     https://doi.org/10.1016/J.ENG.2017.01.002
Research |
Corrigendum to “High-Speed Railway Train Timetable Conflict Prediction Based on Fuzzy Temporal Knowledge Reasoning” 
He Zhuang1,2,Liping Feng1(),Chao Wen1,2,Qiyuan Peng1,3,Qizhi Tang2
1. School of Transportation and Logistics, Southwest Jiaotong University, Chengdu 610031, China
2. China Railway Corporation, Beijing 100844, China
3. National United Engineering Laboratory of Integrated and Intelligent Transportation, Southwest Jiaotong University, Chengdu 610031, China
4. Department of Civil and Environmental Engineering, University of Waterloo, Waterloo N2L 3G1, Canada
Abstract
Abstract   
Keywords       
Fund: 
Corresponding Authors: Liping Feng   
Just Accepted Date: 11 January 2017   Online First Date: 13 January 2017    Issue Date: 02 March 2017
Service
E-mail this article
E-mail Alert
RSS
Articles by authors
He Zhuang
Liping Feng
Chao Wen
Qiyuan Peng
Qizhi Tang
Cite this article:   
He Zhuang,Liping Feng,Chao Wen, et al. Corrigendum to “High-Speed Railway Train Timetable Conflict Prediction Based on Fuzzy Temporal Knowledge Reasoning” [J]. Engineering, 2017, 3(1): 150 .
URL:  
http://engineering.org.cn/EN/10.1016/J.ENG.2017.01.002     OR     http://engineering.org.cn/EN/Y2017/V3/I1/150
References
Related
[1] Lance A. Davis. Falcon Heavy[J]. Engineering, 2018, 4(3): 300 .
[2] Augusta Maria Paci. A Research and Innovation Policy for Sustainable S&T: A Comment on the Essay ‘‘Exploring the Logic and Landscape of the Knowledge System”[J]. Engineering, 2018, 4(3): 306 -308 .
[3] Ning Duan. When Will Speed of Progress in Green Science and Technology Exceed that of Resource Exploitation and Pollutant Generation?[J]. Engineering, 2018, 4(3): 299 .
[4] Veena Sahajwalla. Green Processes: Transforming Waste into Valuable Resources[J]. Engineering, 2018, 4(3): 309 -310 .
[5] Yihui Ding. Sustainable Management and Action in China under the Increasing Risks of Global Climate Change[J]. Engineering, 2018, 4(3): 301 -305 .
[6] David Singleton AM. What Are the Best Infrastructure Investments to Make? Is It Based on Economics, or Resilience, or Both?[J]. Engineering, 2018, 4(2): 180 -181 .
[7] Haibo Zhang, Changyu Yang. The Longest Railway Tunnel in China[J]. Engineering, 2018, 4(2): 165 -166 .
[8] Weiguo He, Peng Liu. The Undersea Tunnel on Qingdao Metro Line 8[J]. Engineering, 2018, 4(2): 167 -169 .
[9] Katherine Shirey. Breaking the Silos of Discipline for Integrated Student Learning: A Global STEM Course’s Curriculum Development[J]. Engineering, 2018, 4(2): 170 -174 .
[10] Antonello De Risi. The Three ‘‘As” of the Naples Metro System[J]. Engineering, 2018, 4(2): 175 -179 .
[11] John C. Moore. Glaciology and Global Climate Change[J]. Engineering, 2018, 4(1): 6 -8 .
[12] Yong Zhao, Pengfei Li. A Statistical Analysis of China’s Traffic Tunnel Development Data[J]. Engineering, 2018, 4(1): 3 -5 .
[13] Binxing Fang, Kui Ren, Yan Jia. The New Frontiers of Cybersecurity[J]. Engineering, 2018, 4(1): 1 -2 .
[14] Jackie Craig. Cybersecurity Research—Essential to a Successful Digital Future[J]. Engineering, 2018, 4(1): 9 -10 .
[15] Wentao Yan, Ya Qian, Weixin Ma, Bin Zhou, Yongxing Shen, Feng Lin. Erratum to ‘‘Modeling and Experimental Validation of the Electron Beam Selective Melting Process” [Engineering 3 (2017) 701–707][J]. Engineering, 2018, 4(1): 164 .
Copyright © 2015 Higher Education Press & Engineering Sciences Press, All Rights Reserved.
京ICP备11030251号-2

 Engineering