Please wait a minute...
Submit  |   Chinese  | 
 
Advanced Search
   Home  |  Online Now  |  Current Issue  |  Focus  |  Archive  |  For Authors  |  Journal Information   Open Access  
Submit  |   Chinese  | 
Engineering    2017, Vol. 3 Issue (1) : 150     https://doi.org/10.1016/J.ENG.2017.01.002
Research |
Corrigendum to “High-Speed Railway Train Timetable Conflict Prediction Based on Fuzzy Temporal Knowledge Reasoning” 
He Zhuang1,2,Liping Feng1(),Chao Wen1,2,Qiyuan Peng1,3,Qizhi Tang2
1. School of Transportation and Logistics, Southwest Jiaotong University, Chengdu 610031, China
2. China Railway Corporation, Beijing 100844, China
3. National United Engineering Laboratory of Integrated and Intelligent Transportation, Southwest Jiaotong University, Chengdu 610031, China
4. Department of Civil and Environmental Engineering, University of Waterloo, Waterloo N2L 3G1, Canada
Abstract
Abstract   
Keywords       
Fund: 
Corresponding Authors: Liping Feng   
Just Accepted Date: 11 January 2017   Online First Date: 13 January 2017    Issue Date: 02 March 2017
Service
E-mail this article
E-mail Alert
RSS
Articles by authors
He Zhuang
Liping Feng
Chao Wen
Qiyuan Peng
Qizhi Tang
Cite this article:   
He Zhuang,Liping Feng,Chao Wen, et al. Corrigendum to “High-Speed Railway Train Timetable Conflict Prediction Based on Fuzzy Temporal Knowledge Reasoning” [J]. Engineering, 2017, 3(1): 150 .
URL:  
http://engineering.org.cn/EN/10.1016/J.ENG.2017.01.002     OR     http://engineering.org.cn/EN/Y2017/V3/I1/150
References
Related
[1] Joe A. Sestak Jr.. High School Students from 157 Countries Convene to Address One of the 14 Grand Challenges for Engineering: Access to Clean Water[J]. Engineering, 2017, 3(5): 583 -584 .
[2] Holger Krueger. Standardization for Additive Manufacturing in Aerospace[J]. Engineering, 2017, 3(5): 585 .
[3] Lance A. Davis. Climate Agreement—Revisited[J]. Engineering, 2017, 3(5): 578 -579 .
[4] Ben A. Wender, M. Granger Morgan, K. John Holmes. Enhancing the Resilience of Electricity Systems[J]. Engineering, 2017, 3(5): 580 -582 .
[5] Maggie Bartolomeo. Third Global Grand Challenges Summit for Engineering[J]. Engineering, 2017, 3(4): 434 -435 .
[6] Raffaella Ocone. Reconciling “Micro” and “Macro” through Meso-Science[J]. Engineering, 2017, 3(3): 281 -282 .
[7] Jian-Feng Chen. Green Chemical Engineering for a Better Life[J]. Engineering, 2017, 3(3): 279 .
[8] Shouren Zheng. Reflections on the Three Gorges Project since Its Operation[J]. Engineering, 2016, 2(4): 389 -397 .
[9] Dabo Guan, Yuli Shan, Zhu Liu, Kebin He. Performance Assessment and Outlook of China’s Emission-Trading Scheme[J]. Engineering, 2016, 2(4): 398 -401 .
[10] Lance A. Davis. Climate Agreement[J]. Engineering, 2016, 2(4): 387 -388 .
[11] Michel Leboeuf. High-Speed Rail: Opportunities and Threats[J]. Engineering, 2016, 2(4): 402 -408 .
[12] Lance A. Davis. Genetically Engineered Crops[J]. Engineering, 2016, 2(3): 268 -269 .
[13] Lance A. Davis. The World’s Longest Tunnel[J]. Engineering, 2016, 2(3): 263 -264 .
[14] Huawu He. Key Challenges and Countermeasures with Railway Accessibility along the Silk Road[J]. Engineering, 2016, 2(3): 288 -291 .
[15] Office of the South-to-North Water Diversion Project Construction Committee, State Council, PRC. The South-to-North Water Diversion Project[J]. Engineering, 2016, 2(3): 265 -267 .
Copyright © 2015 Higher Education Press & Engineering Sciences Press, All Rights Reserved.
京ICP备11030251号-2

 Engineering