Content
Frontiers of Structural and Civil Engineering >> 2011, Volume 5, Issue 2 doi: 10.1007/s11709-011-0105-y
Long-term settlement behavior of ground around shield tunnel due to leakage of water in soft deposit of Shanghai
1. State Key Laboratory of Ocean Engineering and Department of Civil Ergineering, Shanghai Jiao Tong University, Shanghai 200240, China; 2. Department of Civil Engineering, Saga University, Saga 840-8502, Japan
Abstract
Keywords
lining deficit ; leakage of water ; shield tunnel ; settlement ; soft deposit
Content