China's High Dams Construction and Research on Science and Technology

Chinese Society for Hydroelectric Engineering, Beijing 100761, China

Received: 2000-03-20 Revised: 2000-10-19 Available online: 2000-12-20

Next Previous

Abstract

The development and characteristics of high dams construction in China are introduced. The scientific and technological achievements and their application in geologic exploration, dam construction, flood discharging and energy dissipation, treatment of dam foundation and treatment of high rock slope, etc. , are also described. The developing trends of high dams in the future are presented and the key research works on science and technology of high dams are indicated.

According to the incomplete statistical data, about 24 000 dams over 15 min height have been constructed, and there are 16 dams with height over 150 m to be completed or under construction. They in elude the 181 m-high concrete gravity dam in the Three Gorges Project, the 240 m — high Ertan double curvature concrete arch dam, the 178 m- high Tianshenqiao No. 1 CFRD, the 182 m- high Hongjiadu CFRD, the 233 m~high Shuibuya CFRD, the 130 m- high Shapai RCC arch dam, the 131 m- high Jiangya RCC gravity dam, etc.

References

[ 1 ] 陈宗梁 .我国水电建设和科技进步 5 0年 [J].中国电力 , 1999.10 link1

[ 2 ] 陈宗梁 .世界超级高坝 [M ].北京 :中国电力出版社 , 1998.1 link1

[ 3 ] 潘家铮 (主编 ) .水工建筑物设计丛书 [M ].北京 :水利电力出版社 , 1992

[ 4 ] 曹楚生 .中国的坝工 [M ].中国水利 北京 :水利电力出版社 , 1991.3

[ 5 ] 国家电力公司科技教育局 .“八五”国家重点科技项目 (攻关 ) 计划项目执行情况及主要经验 [J].水力发电 , 1998.3

[ 6 ] 邴凤山 .2 1世纪初中国水电建设的展望 [J].水电能源科学 , 1999.7 link1

[ 7 ] InternationalWaterpower&DamConstruction , Year book , 1997, 1998

[ 8 ] 陈宗梁 .“八五”水电科技攻关计划概况 [J].水力发电 , 1990 .12 link1

[ 9 ] 许百立 .我国水工建筑物的设计技术成就 [M ].中国水利水电技术与成就 .北京 :中国电力出版社 , 1997.9

[10] 陈道周 , 高官堂 .我国丰满水电站的改造 [C].2 1世纪水力发电工程科学技术发展战略研讨会论文集 .北京 :中国电力出版社 , 1999.11 link1

Related Research