The processing and precision control of large thinwall steel caisson

CCCC Second Highway Engineering Co., LTD., Xi'an 710065, China

Received: 2010-01-22 Available online: 2010-04-14 13:19:23.000

Next Previous

Abstract

It was discussed the proper choice for processing and welding technology of large thin-wall steel caisson in Taizhou Bridge. According to the caisson's characteristics of large size and thin wall, reasonable welding and assembly methods were adopted to effectively control precision in the processes of fabricating and assembling pieces of each unit and the whole caisson, and the welding and anti-deformation precision of thin-wall steel sheet can be controlled too. Thus the processing quality was guaranteed.

Figures

图1

图2

图3

图4

图5

图6

图7

图8

图9

图10

图11

References

[ 1 ] 中华人民共和国 交 通 部.公 路 桥 涵 施 工 技 术 规 范 ( JTJ041 - 2000 ) [ S] .北京:人民交通出版社,2000

[ 2 ] 中华人民共和国国家发展 和改革 委员 会.焊 接 工 艺 评 定 规 程 ( DLT868 -2004 ) [ S] .2004 -03 -23

[ 3 ] 中国标准出版社.气体保护焊用钢丝( GB /T14958 -94 ) [ S] . 北京:中国标准出版社,1994

[ 4 ] 中华人民共和国铁道部.对接焊缝超声波探 伤( TB1558 -84 ) [ S] .1985 -10 -01

[ 5 ] 中华人民共和国交通部公 路科学 研究 所.公 路 工 程 质 量 检 验 评定标准( JTG F80 /1 -2004 ) [ S ] .北 京: 人 民 交 通 出 版 社, 2004

Related Research