Journal Home Online First Current Issue Archive For Authors Journal Information 中文版

Strategic Study of CAE >> 2012, Volume 14, Issue 4

Research and practice of layered cross cyclic injectionproduction water flooding technology in ultrahigh water cut stage

No.3 Oil Product Company, Daqing Oilfield Co., Ltd., Daqing, Heilongjiang 163113, China

Received: 2012-02-14 Available online: 2012-04-12 14:24:54.000

Next Previous

Abstract

Aiming at the remaining oil distribution feature in ultrahigh water cut stage and oil layers depositional features in the north of Saertu Oilfield, guided by the hydrodynamic principle, based on the practical experience and analysis of cyclic water flooding in combination with numerical simulation, cyclic water flooding and various parameters are optimized, and layered cross injection with changing fluid direction is adopted so as to improve the development effect which has acquired favorable result in practice.

Figures

图1

图2

图3

图4

图5

图6

图7

图8

References

[ 1 ] 中国石油天然气总公司.改善高含水期油田注水开发效果实例[M].北京:石油工业出版社,1993.

[ 2 ] 刘立支,肖华珍.周期注水油藏因素分析[J].胜利油田职工大学学报,2000(4):14-16. link1

[ 3 ] 孟翠萍,韩新宇,汪慧娟.周期注水提高采收率研究及应用[J].内蒙古石油化工,2005(1):77-78. link1

[ 4 ] 张继春.周期注水实验及增油机理研究[J].石油学报,2003(2):76-80. link1

Related Research