Journal Home Online First Current Issue Archive For Authors Journal Information 中文版

Strategic Study of CAE >> 2015, Volume 17, Issue 3

The study on investment and financing of non-grid-connected wind power system

1. Science and Technology Bureau in Jiangsu Zhongguancun Science and Technology Industrial Park, ChangZhou, Jiangsu 213300, China;

2. Jiangsu Institute of Macroeconomic Research, Nanjing 210013, China

Received: 2014-12-15 Available online: 2015-03-12 11:19:53.000

Next Previous

Abstract

In this paper, the ways of investment and financing of non-grid-connected wind power system was studied. Firstly expounds the wind power investment and financing. Secondly, the development of non-grid-connected wind power system was introduced. Then the available investment and financing methods on non-grid-connected wind power system was analyzed, to actively promote the development of this industry. Finally the article also mentioned the problems faced of non-grid-connected wind power system and gave relevant suggestions.

Figures

图1

References

[ 1 ] 顾为东. 大规模非并网风电系统开发与应用[J]. 电力系统自动 化,2008(19):1-9. link1

[ 2 ] Fang Min,Zhou Liya,Liu Yong,et al. Study on comprehensive economic benefit evaluation index system of the non- grid- connected wind power industry[C]// Proceedings of Non-Grid-Connected Wind Power Systems(ISTP).US:The American Scholars Press,2008:242-252.

[ 3 ] 顾为东,周志莹,邱 涛.长三角浅海辐射沙洲风能资源开发与 非并网风电产业发展研究[J].资源科学,2009,31(11):1856- 1861. link1

[ 4 ] McElroy M B,Lu X,Nielsen C P,et al. Potential for wind-generated electricity in China[J]. Science,2009,325,1378-1380. link1

[ 5 ] 顾为东. 非并网风电对中国风电发展的影响与前景分析[D].上 海电力,2007,1:11-18. link1

[ 6 ] Khawaji A D,Kutubkhanah I K,Wie J M. Advances in seawater desalination technologies[J].Desalination,2008 (221):47-69. link1

[ 7 ] Almulla A,Hamad A,Gadalla M. Integrating hybrid systems with existing thermal desalination plants[J]. Desalination , 2005(174),171-192. link1

Related Research